GREEN COUNTRY

DELIVER INNOVATIVE MOLDED PRODUCT .
TO SOLUTIONS INTERIOR AND EXTERIOR SPACES , ALSO ACCELERATE CONSTRUCTION .
GRG QUALITY CONTROL
In Green Country, strict quality control process is followed to ensure the best quality. 

Every step requires full inspection of QA/QC and signature before making next step. 

 


 

GRG MATERIAL

GRG compositions are mainly high strength gypsum and glass fiber, and the inspection criterion is whether the qualification for out of factory and Material test Report meet clients and international standards.
 
DESIGN
According to client’s design concept and specifications, GC collect data's and reference images as many as possible, e.g. style, age, pattern and architecture etc. and then develop into shop drawings for client’s approval.

MASTER MOULD
According to 3D drawings and reference images, we start from CNC Carving, and then artificial carving by professional sculptors to develop the details to enrich the aesthetic effect and the overall artistic depth. 
In this step, the main inspecting points are the 3D dimension and artistic effect.
 
MOULDING
After the client approved the master model, the molding team will determine what kind of material is most suitable for the specific mould pattern. 
Major materials considered for mould making are silicon and FRP, and the inspecting points in this step are the marginal adaptation and intensity of mould. 
 
FIRST ARTICLE
After Green Country internal QA/QC approved the mould, the fabrication director will arrange first article production. 
The dimensions and interior structure of the first article should be exactly the same as what are shown in the drawings approved by the client. 
The inspectors in this process are required to simulate assembling without actual fixation to make sure each piece for the corresponding first article matches perfectly, as well as offering instructions for onsite installation.            
 

PAINTING

Before painting, both the surface of the product and the environment should be in good condition. After painting, the inspector is required to check the below points sheet.
 
 

GOLD FOIL
The checking point is if flatness and the pattern on the correct position should be as approved drawings. After primer, it is the step of gold glue and wait for the surface condition suitable to apply gold foil, finally level and clear up the extra gold foil with brush. If not approved by GC inspector or client, it should be redone.  


FINAL INSPECTION

Before package, it is required to check the GRG product dimensions, production quantity and surface cleanliness. 




Taipei . Guangdong . Beijing . Macau INFORMATION